Move net unit tests to packages/Connectivity

Move the tests together with packages/Connectivity code, so both can be
moved to packages/modules/Connectivity together.

Also reorganize unit tests in a unit/ directory, as other tests
(integration/, common/ etc.) have been added in tests/net since they
were created. This makes the directory structure consistent.

Test: atest FrameworksNetTests
Bug: 187814163
Ignore-AOSP-First: needs per-branch move for merge conflicts
Change-Id: I254ffd1c08ec058d594b4ea55cbae5505f8497cc
This commit is contained in:
Remi NGUYEN VAN
2021-05-11 13:37:06 +00:00
parent 64e0c100b1
commit 65b8995a15
147 changed files with 628 additions and 1 deletions

File diff suppressed because it is too large Load Diff